MoIT

Find out whatโ€™s going on & stay up to date.

Latest Updates

The Construction Division,on behalf of Project Dantak is inviting eligible bidders to provide consultancy services for a proposed 266-meter iconic bridge at km 1.275 on the Damchuโ€“Haa Link Road under 60 RCC/19 BRTF in Bhutan.

Tender Notifications

The scope of work includes: Tender Documnets can be downloaded below:…...
Read More The Construction Division,on behalf of Project Dantak is inviting eligible bidders to provide consultancy services for a proposed 266-meter iconic bridge at km 1.275 on the Damchuโ€“Haa Link Road under 60 RCC/19 BRTF in Bhutan.

The Construction Division, on behalf of Project Dantak, invites all the eligible bidders to participate in Resurfacing works on the Phuentsholingโ€“Thimphu Road inside Bhutan from Km 141.280 to 147.779 (new chainage Km 121.280 to 127.779) under 102 RCC/19 BRTF, Project DANTAK, including laying and compacting 40 mm bituminous concrete, correction works with 50 mm dense bituminous macadam, application of tack coat, thermoplastic road marking, and preparation for fixing cat eyes, all as per MoRT&H and project specifications.

Tender Notifications

Tender Documents can be downloaded below:...
Read More The Construction Division, on behalf of Project Dantak, invites all the eligible bidders to participate in Resurfacing works on the Phuentsholingโ€“Thimphu Road inside Bhutan from Km 141.280 to 147.779 (new chainage Km 121.280 to 127.779) under 102 RCC/19 BRTF, Project DANTAK, including laying and compacting 40 mm bituminous concrete, correction works with 50 mm dense bituminous macadam, application of tack coat, thermoplastic road marking, and preparation for fixing cat eyes, all as per MoRT&H and project specifications.

PROVIDING AND FIXING OF 125 KW SOLAR ROOFTOP AT HEADQUARTERS CHIEF ENGINEER PROJECT DANTAK, SIMTOKHA, THIMPHU, 50 KW SOLAR ROOFTOP AT HEADQUARTERS 19 BRTF, 05 KW SOLAR ROOFTOP AT 1055 FIELD WORKSHOP AT PHUENTSHOLING, 40 KW SOLAR ROOFTOP AT LIASION CELL/TRANSIT CAMP, JAIGAON, 25 KW SOLAR ROOFTOP AT OFFICER’S MESS AT JAIGAON AND 05 KW SOLAR ROOFTOP AT WET CANTEEN, TAKHTI UNDER PROJECT DANTAK

Tender Notifications

Tender Documnets can be downloaded below:...
Read More PROVIDING AND FIXING OF 125 KW SOLAR ROOFTOP AT HEADQUARTERS CHIEF ENGINEER PROJECT DANTAK, SIMTOKHA, THIMPHU, 50 KW SOLAR ROOFTOP AT HEADQUARTERS 19 BRTF, 05 KW SOLAR ROOFTOP AT 1055 FIELD WORKSHOP AT PHUENTSHOLING, 40 KW SOLAR ROOFTOP AT LIASION CELL/TRANSIT CAMP, JAIGAON, 25 KW SOLAR ROOFTOP AT OFFICER’S MESS AT JAIGAON AND 05 KW SOLAR ROOFTOP AT WET CANTEEN, TAKHTI UNDER PROJECT DANTAK

The Construction Division,on behalf of Project Dantak is inviting eligible bidders to provide consultancy services for a proposed 266-meter iconic bridge at km 1.275 on the Damchuโ€“Haa Link Road under 60 RCC/19 BRTF in Bhutan.
The scope of work includes: Detailed soil investigation Preparation of DPR (Detailed Project Report) Bridge...
The Construction Division, on behalf of Project Dantak, invites all the eligible bidders to participate in Resurfacing works on the Phuentsholingโ€“Thimphu Road inside Bhutan from Km 141.280 to 147.779 (new chainage Km 121.280 to 127.779) under 102 RCC/19 BRTF, Project DANTAK, including laying and compacting 40 mm bituminous concrete, correction works with 50 mm dense bituminous macadam, application of tack coat, thermoplastic road marking, and preparation for fixing cat eyes, all as per MoRT&H and project specifications.
Tender Documents can be downloaded below: NIT2Download
PROVIDING AND FIXING OF 125 KW SOLAR ROOFTOP AT HEADQUARTERS CHIEF ENGINEER PROJECT DANTAK, SIMTOKHA, THIMPHU, 50 KW SOLAR ROOFTOP AT HEADQUARTERS 19 BRTF, 05 KW SOLAR ROOFTOP AT 1055 FIELD WORKSHOP AT PHUENTSHOLING, 40 KW SOLAR ROOFTOP AT LIASION CELL/TRANSIT CAMP, JAIGAON, 25 KW SOLAR ROOFTOP AT OFFICER'S MESS AT JAIGAON AND 05 KW SOLAR ROOFTOP AT WET CANTEEN, TAKHTI UNDER PROJECT DANTAK
Tender Documnets can be downloaded below: NIT01Download
ย VACANCY ANNOUNCEMENT
The Ministry of Infrastructure and Transport is pleased to announce the vacancy for the following positions...
SELECTION RESULT
As per the approval of the 104th  MHRC Meeting held on April 21, 2026, the Ministry of Infrastructure...
The Construction Division,on behalf of Project Dantak is inviting eligible bidders to provide consultancy services for a proposed 266-meter iconic bridge at km 1.275 on the Damchuโ€“Haa Link Road under 60 RCC/19 BRTF in Bhutan.
The scope of work includes: Detailed soil investigation Preparation of DPR (Detailed Project Report) Bridge...
The Construction Division, on behalf of Project Dantak, invites all the eligible bidders to participate in Resurfacing works on the Phuentsholingโ€“Thimphu Road inside Bhutan from Km 141.280 to 147.779 (new chainage Km 121.280 to 127.779) under 102 RCC/19 BRTF, Project DANTAK, including laying and compacting 40 mm bituminous concrete, correction works with 50 mm dense bituminous macadam, application of tack coat, thermoplastic road marking, and preparation for fixing cat eyes, all as per MoRT&H and project specifications.
Tender Documents can be downloaded below: NIT2Download
PROVIDING AND FIXING OF 125 KW SOLAR ROOFTOP AT HEADQUARTERS CHIEF ENGINEER PROJECT DANTAK, SIMTOKHA, THIMPHU, 50 KW SOLAR ROOFTOP AT HEADQUARTERS 19 BRTF, 05 KW SOLAR ROOFTOP AT 1055 FIELD WORKSHOP AT PHUENTSHOLING, 40 KW SOLAR ROOFTOP AT LIASION CELL/TRANSIT CAMP, JAIGAON, 25 KW SOLAR ROOFTOP AT OFFICER'S MESS AT JAIGAON AND 05 KW SOLAR ROOFTOP AT WET CANTEEN, TAKHTI UNDER PROJECT DANTAK
Tender Documnets can be downloaded below: NIT01Download
INVITATION OF QUOTATION FOR SUPPLY OF CONSTRUCTIONAL STORES,Project Dantak
Tender Documnets can be downloaded below: ENQ-04 dt 21 Apr 26 (2)Download
INVITATION OF QUOTATION FOR SUPPLY OF CONSTRUCTIONAL STORES,Project Dantak
Tender Documnets can be downloaded below: ENQ-03 dt 21 Apr 26 (2)Download
INVITATION FOR SUBMISSION OF EXPRESSION OF INTEREST (EOI)FOR RECRUTIMENT OF INTERNATIONAL INSTITUTIONAL SPECAILIST TO DESIGN THE NATIONAL URBAN SERVICES TARIFF ADJUSTMENT GUIDELINES.
Deadline for submission proposal: 9 February 2022 ย  EOI-advertisementDownload
FACILITATION FOR THE SUBMISSION OF BIDS
The Department of Engineering Services, MoWHS as a Secretariat for the construction of 2500 bedded fully...
Notification- Bhutan Schedule of Rates
The Department of Engineering Services under the Ministry of Works and Human Settlement is pleased to...
Disclosure of Environmental and Social Safeguard Reports under the Water Flagship Program Support Project
The construction of water supply system for Pamtsho LAP under Thimphu Thromde and the construction of...
Circular:
Agreement for Rental and Land lease...
Ministry of Information and Communications(MoIC) and the Ministry of Works and Human Settlement is Merged and renamed as Ministry of Infrastructure and Transport(MoIT)
Notification-on-MoITDownload
Addendum No. 02 - Notification of Bid Cancelation for the work Detail Design and Construction of Hordung Zam at Nichula, Lhamoyzingkha, Dagana.
The Bridge Division, Department of Surface Transport hereby notifies all the bidders that the invitation...
Addendum: Detail Study and Design of Hordhung Zam at Nichula, Lhamoizingkha, Dagana
The Bridge Division, DoST hereby issue an “Addendum” for the bid “Detail Study and...
Addendum 02: Detail Study and Design of Hordhung Zam at Nichula, Lhamoizingkha, Dagana
The Bridge Division, DoST hereby issue an “Addendum 02” for the bid “Detail Study and...
Bhutan Green Transport Project (BGTP) Investor Day
The Royal Government of Bhutan (RGoB), through the Ministry of Infrastructure and Transport (the MoIT),...
Read More
Read More
Read More
Read More
Read More
Read More
Read More
Read More
Read More
Read More
Read More
Read More
Read More
Read More
Read More
Read More
Read More
Read More
Read More
Read More

NEWS & EVENTS

mou sw
The Ministry of Infrastructure and Transport and the City of Zurich, Switzerland, signed a Memorandum of Understanding (MoU)
The Ministry of Infrastructure and Transport and the City of Zurich, Switzerland, signed a Memorandum...
sbridge
๐——๐—ฟ๐—ฎ๐—บ ๐—ญ๐—ฎ๐—บ ๐—•๐—ฟ๐—ถ๐—ฑ๐—ด๐—ฒ ๐—ฎ๐—ป๐—ฑ ๐—ฆ๐—ฎ๐—บ๐˜๐˜€๐—ฒโ€“๐—ก๐—ผ๐—ฟ๐—ฏ๐˜‚๐—ด๐—ฎ๐—ป๐—ด ๐—œ๐—ป๐—ฑ๐˜‚๐˜€๐˜๐—ฟ๐—ถ๐—ฎ๐—น ๐—ฅ๐—ผ๐—ฎ๐—ฑ
Department of Surface Transport, Ministry of Infrastructure and Transport successfully inaugurated the...
moit
Recruitment update โ€“ Welcome to the MoIT Family
The Ministry of Infrastructure and Transport (MoIT) is pleased to welcome 19 newly recruited employees...
Air-Services-Agreement-
A Memorandum of Understanding (MoU) on Air Services Agreement
A Memorandum of Understanding (MoU) on Air Services Agreement was signed on 19 August 2025 between the...
Picture1
Awarded Trashi Khadhar to the five newly appointed chiefs
The Ministry of Infrastructure and Transport (MoIT) organized Trashi Khadhar Ceremony for the newly appointed...
625981054_1230300405943748_8516407648542833259_n (1)
Department of Surface Transport today signed a nine-month contract worth Nu. 350,415,000
Department of Surface Transport, Ministry of Infrastructure and Transport today signed a nine-month contract...
Close Search Window

Accessibility Toolbar